Rejuvenation of Rejuve Site Office
Rejuvenation of 50,000 sq ft Rejuve Site Office in PP(M)SB
Erection & Installation of 1,800 Ton Mechanical Equipments & Steel Structural for 100 TPD SWTE Plant Project, Kualiti Alam, Sendayan, Negeri Sembilan
1,100 Ton Flue Gas Treatment (FGT) & Incineration System
500 Ton Waste Heat Boiler
200 Ton Air Cooling Condenser (ACC) System
Tank Farm & Utilities Area
PCC 15,600 Dia Inch Stainless Steel & Carbon Steel Piping Works for 100 TPD SWTE Plant Project, Kualiti Alam, Sendayan, Negeri Sembilan
Materials Supply
Fabrication at RME Port Dickson Yard
Erection & Pre-Commissioning Works
EPCC of Major Tank Repair Works for Tank 1 and Tank 4, PDB Prai Fuel Terminal
Major tank repair works
Tank Jacking Works up to 1.6m height for civil inspection & repair works
Replacement of bottom plates
Re-construction of tank shoulder
Minor Piping Works
Pre-Commissioning & Commissioning Works
EPCC of 2 Units Jet A1 Pump at Subang Aviation Terminal
Engineering Design, Construction & Commissioning Works
Mechanical & Piping Works
Electrical & Instrument Works
Piping Erection Works, RGT2 Project
Manpower Supply (PMT, Mechanical & Piping Works)
EPCC of Fire Duty Pump at Subang Aviation Terminal
Engineering Design, Construction & Commissioning Works
Mechanical & Piping Works
Renovation works of BHP Petrol Stations, Bahau
Electrical & Instrument Works
Replacement of Underground Storage Tanks and Piping
Reconstruction of BHPMart Building & Interior Works
Manpower Supply for Wheatstone Project, Chevron Australia
Multi trades including PMT & Skilled Workers
EPCC Seawater Intake Facility c/w Associated Accessories for Fire Fighting System at Langkawi Fuel Terminal
Engineering Design of New Seawater Intake
10" Seawater Pipeline to Firewater Tank
New Pump House at Jetty Area
Earthing System for New Pump House
Civil Upgrading Work for Tank Skirting and Road Pavement at Langkawi Aviation Terminal
Upgrading of 5 nos Existing Jet A1 Storage Tanks Skirting
Replacement of 3,000m2 of Road Pavement to Concrete Pavement
Replacement of Bottom Plate for Tank 13, Prai Fuel Terminal
Replacement of Tank Bottom Plates (29m Diameter)
Fabrication, Installation, Blasting & Painting, Hydrotest & Tank Commissioning
Refurbishment of Concrete Tank Pad including oil resistant coating
EPCC of Bottling Plant Structure Extension and Associated Works
Engineering Design of Roof Structural and Footing
Construction of Roof Structural & Footing
Mechanical & Electrical Works for Firefighting System at Bottling Plant
EPCC of LPG Loading Piping Works for PDB LPG Pasir Gudang Terminal
Engineering Design of LPG Loading Piping
Construction & Commisisoning of Tanker New Loading Pipeline
Tank Conversion Works from ADO to ULG, Tank 13 at Prai Fuel terminal
Engineering Design for Internal Floating Roof, Piping & Instrumentation for ULG Tank
Mech & Piping works from ADO to ULG
E & I works for Tank Radar & Temperature System
Construction & Commissioning of New Internal Floating Roof (29m Diameter)
Offshore Mechanical Fabrication & Topside Installation Works; Regasification Project, LEKAS for PETRONAS Gas Berhad.
Multi trades including PMT & Skilled Workers
EPCC of New U95 Loading Arm Skid for Island 3 and Extension of Roof Structure, Shell Bagan Luar Terminal, Prai.
New Top Loading Arm Skid for ULG 95
Hot & Cold Cutting for Loading Arm Pipeline
Civil & Structural Works for Gantry Roof Structure
Plant Turnaround Works for 51 PMT/PMD Equipments for DOSH Inspection and to Perform Ultrasonic Test Gauge (UTG) for All Static Equipments.
Installation Of Dual Pump Skid For Mogas Additive Injection System At SMT Tanjung Gelang Installation.
Remediation Works of Pipe & Pipe Support for SMT – Pasir Gudang Installation, Johor
PETRONAS Revamp Project (PSR 2 Melaka) – Piping Works and Equipment Installation Works.
Rectify Existing Pipeline & Turbine alignment Works pipe modification, hydrotest works and precision alignment for 2 unit gas turbine include bolt tensioning.
Prefabrication & Erection 10 Unit Storage Tank 200 TON metric steel structure works, erection of 100 MT Equipment and 20,000 dia-inches piping works for 120,000 MTPY Bio-Diesel Plant at Kuching, Sarawak.
To construct All Civil Foundation works, C/W Surveyor work, prefabrication and erection of stainless steel 304 flare stack piping.
Fabrication and installation of pipe spool for PETRONAS Gas Compressor Station Project. Total dia-inches 35,000di. Excavation, pipe laying and back filling of NPS 28” & 36” underground piping works.
Port Dickson Rehabilitation Project Phase 2, 750MW Combine Cycle Power Plant M & E Erection Works.
Inhouse civil contractor for PPMSB; Supply material and skill workers to carry out all reinforcement and infrastructure works, blasting & painting Work.
Idemitsu Plant Turnaround February 2007: tank cleaning works, Cooling Tower Cleaning works and replacement of Heat Exchanger Bundle Tube by using bundle puller.
Design, Construction and Erection of 1x300m3 Temporary storage Water Tank and Associated Works for PD2 Site Preparation at Tuanku Jaafar Power Station.
Titan Turn-Around March 2006 (Piping Works).